COMMISSIONING MANAGEMENT

Essentially, the commissioning process formalizes review and integration of all project expectations during planning, design, construction, and occupancy phases by inspection, functional, performance testing, and oversight of operator training and record documentation.
Commissioning of Systems and plant is generally conducted in line with ASHRAE level 1 to 5 testing which was developed for Critical l Asset facilities to offer a full quality assured and controlled testing regime and management of the Commissioning process. This is adopted now in most builds to deliver QA/QC control to the Commissioning phases.

Commissioning provisions included- measuring stations-balancing facilities-
By pass provisions-isolation facilities for maintenance- commissioning design basis indicated- air and water flow rates- fan and pump duties- chw coil duties etc

Duct sizing and pipe sizing checks for design flows- diversity calcs- sample checks-. Metering provisions

Back up power provisions-. Breaker ratings — points of failure analysis

Back up power provisions-. Breaker ratings — points of failure analysis

Solation provisions for water systems- vents etc a switchgear type and ratings

Solation provisions for water systems- vents etc a switchgear type and ratings

Code compliances

Commision

Commissioning verification

Reeftech have conducted numerous Verification of TAB scope and Commissioning scope across the Industry sectors. Our vast experience within this sector allows us to offer a complete commissioning

validation service as follows:

Commission-ability studies and reporting on initial design pre construction phase and into the construction stages.

Review and reporting on Programmes

Review and reporting on the Method statements for compliance.

Static witnessing

Flushing process over view for compliance to codes and Method statements.

Start up plan reviews

Pre commissioning check verification